Managing Project Schedules in Project Professional vs. PWA

Posted By Posted by: Laith Adel on June 10, 2013

We used to say that one of the main things you can’t do in PWA schedule PDP is baseline. In 2013 you can actually baseline a project in PWA. But if you are wondering what the difference is between scheduling in PWA and Project Pro in 2013, then here is your answer: Project Management Feature Comparison Project

Read More


Blog Posted In Blog Posted In: Blog
Blog Posted In 

Column Limits on SharePoint Lists

Posted By Posted by: EPM Partners on June 7, 2013

Problem Limited amount of columns can be created in SharePoint list in the project site. Solution The only way is to optimise the number and type of columns used to ensure the best combination of columns are created. Referencing the Technet article from Microsoft. http://technet.microsoft.com/en-us/library/cc262787.aspx#Column Each list/library item can only occupy 8,000 bytes in total

Read More


Blog Posted In Blog Posted In: SharePoint
Blog Posted In