We used to say that one of the main things you can’t do in PWA schedule PDP is baseline. In 2013 you can actually baseline a project in PWA. But if you are wondering what the difference is between scheduling in PWA and Project Pro in 2013, then here is your answer:
Project Management Feature Comparison |
Project Web Access (PWA) |
Project Professional |
Resource Levelling |
Available |
|
Recognize and correct resource overall location scenarios using automatic resources levelling techniques. | ||
Task Path Highlighting |
Available |
|
See how tasks come together and identify which are most critical to a project’s success. | ||
Split Tasks |
Available |
|
Split tasks and show them as split in the Gantt chart. | ||
Task Inspector |
Available |
|
Additional analysis to resolve scheduling conflicts. | ||
Define Local Custom Fields |
Available |
|
All users can define local custom fields. | ||
Time-Phased Editing |
Available |
|
Edit plans and work on a day-by-day basis. | ||
Team Planner Over Allocation Highlighting |
Available |
|
Visual cues identify task over allocations, which can be automatically levelled or manually corrected with drag and drop in Team Planner. | ||
Team Planner Prevent Over Allocations |
Available |
|
Automatically move tasks so that resources cannot become over allocated in Team Planner. | ||
Inactive Tasks |
Read Only |
Available |
Tasks marked inactive in Project Professional are read-only in PWA / Project Online. | ||
Edit Master Projects |
Read Only |
Available |
Master projects are read-only in PWA / Project Online. | ||
Edit Sub-Projects |
Read Only |
Available |
Sub-project cannot be added to a project, but can be edited separately from master projects. | ||
Cross-Project Links |
Read Only |
Available |
Dependency relationships with tasks in other projects are read-only in PWA / Project Online. | ||
Summary Task Assignments |
Read Only |
Available |
Resource assignments on summary tasks are read-only in PWA / Project Online. | ||
WBS Codes |
Read Only |
Available |
Custom Work Breakdown Structure codes are supported, but definitions are read-only in PWA / Project Online. | ||
Multi-Resource Assignments |
Available |
Available |
Assign more than one resource to a particular task. | ||
Automatic / Manual Scheduling |
Available |
Available |
Use the Project scheduling engine to automatically schedule tasks, or do it manually. | ||
Task Linking |
Available |
Available |
Create, edit and delete task dependency relationships. | ||
Project Information |
Available |
Available |
Edit project-level fields and properties. | ||
Edit Large Projects |
Available |
Available |
No limit to the size of plans that are editable. | ||
Import from SharePoint |
Available |
Available |
Import data from a SharePoint project task list into a project plan. | ||
% Complete |
Available |
Available |
Mark task progress as a percentage of the assigned work that is complete. | ||
Cost and Material Resource Assignments |
Available |
Available |
Ability to assign Cost Resources or Material Resources to tasks. | ||
Task Calendars |
Available |
Available |
Define a custom calendar associated with a task. | ||
Fixed Work Tasks |
Available |
Available |
Define the type of a task as fixed work. | ||
Timeline |
Available |
Available |
Build and customize the timeline view to visualize schedule details and communicate with stakeholders. | ||
Edit Assignment Fields |
Available |
Available |
Edit assignment views. | ||
Create Baselines |
Available |
Available |
Create a snapshot baseline of the current project plan. | ||
Task Deadlines |
Available |
Available |
Create deadlines for a task. | ||
Edit Task Type |
Available |
Available |
Change the type of a task. | ||
Effort-Driven Tasks |
Available |
Available |
Scheduling engine support for scheduling a task as effort driven. |